The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / LKA_2011_MPS_V01_M_WB / variable [F1]
enterprise_surveys

Management Practices Survey 2011

Sri Lanka, 2011
Get Microdata
Reference ID
LKA_2011_MPS_v01_M_WB
DOI
https://doi.org/10.48529/w10w-wv24
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
DDI/XML JSON
Created on
May 21, 2012
Last modified
Sep 26, 2013
Page views
64215
Downloads
4118
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • SriLanka2011_MPS_Combined_With_Weights

F1. what was this establishment's output produced as a propo (f1)

Data file: SriLanka2011_MPS_Combined_With_Weights

Overview

Valid: 588
Invalid: 248
Type: Discrete
Decimal: 0
Start: 587
End: 589
Width: 3
Range: -9 - 100
Format: Numeric

Questions and instructions

Question pretext
READ THE FOLLOWING TO THE RESPONDENT BEFORE PROCEEDING: We now change the topic.
Literal question
In fiscal year 2010/11, what was this establishment's output produced as a proportion of the maximum output possible if using all facilities available (capacity utilization)?
Categories
Value Category Cases
-9 DON'T KNOW (SPONTANEOUS) 42
7.1%
25 3
0.5%
30 2
0.3%
35 1
0.2%
40 11
1.9%
45 1
0.2%
50 15
2.6%
55 3
0.5%
60 53
9%
65 13
2.2%
66 1
0.2%
68 2
0.3%
70 45
7.7%
75 58
9.9%
80 122
20.7%
82 1
0.2%
85 28
4.8%
87 1
0.2%
88 3
0.5%
90 83
14.1%
91 2
0.3%
93 3
0.5%
94 4
0.7%
95 34
5.8%
96 2
0.3%
97 2
0.3%
98 12
2%
99 7
1.2%
100 34
5.8%
Sysmiss 248
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
A capacity utilization estimate should be compared to a full production capacity capability.

This question only references the production facility and not the administrative offices.

Full production capacity is the maximum level of production that this establishment could reasonably expect to attain during regular working hours, and under normal and realistic operating conditions fully utilizing the machinery, equipment and employees in place.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.