The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / RWA_2011_ES_V01_M / variable [F1]
enterprise_surveys

Enterprise Survey 2011

Rwanda, 2011 - 2012
Get Microdata
Reference ID
RWA_2011_ES_v01_M
DOI
https://doi.org/10.48529/kjsq-mx64
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
DDI/XML JSON
Created on
Dec 10, 2012
Last modified
Apr 11, 2018
Page views
35652
Downloads
7036
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Rwanda-2011-full
    data-

Did You Experience Insufficient Water Supply For Production In Last Fiscal Yr? (c15)

Data file: Rwanda-2011-full data-

Overview

Valid: 74
Invalid: 167
Type: Discrete
Decimal: 0
Start: 135
End: 136
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
Over fiscal year 2010, did this establishment experience insufficient water supply for production?
Categories
Value Category Cases
-9 do not know 0
0%
1 yes 12
16.2%
2 no 62
83.8%
Sysmiss 167
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Insufficient water supply: whenever there is equipment failure or cessation of production operations due to the lack of or reduction in water supply.
Question post text
If answer is No or Don't Know then GO TO QUESTION C.19
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.