The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / NPL_2009_MS_V01_M_WB / variable [F1]
enterprise_surveys

Micro-Enterprise Survey 2009

Nepal, 2009
Get Microdata
Reference ID
NPL_2009_MS_v01_M_WB
DOI
https://doi.org/10.48529/17b0-pb76
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
DDI/XML JSON
Created on
Mar 24, 2011
Last modified
Sep 26, 2013
Page views
30051
Downloads
4063
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Nepal-2009-Micro-full
    data-

how many days did it take for you to obtain a construction-related permit? (g3)

Data file: Nepal-2009-Micro-full data-

Overview

Valid: 0
Invalid: 118
Type: Discrete
Decimal: 0
Start: 367
End: 368
Width: 2
Range: -9 - 720
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category
-9 dont know
-6 still in process
-5 application denied
1 less than one day
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Waiting time for construction permit. Self-explanatory
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.