The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / AZE_2009_ES_V01_M_WB / variable [F1]
enterprise_surveys

Enterprise Survey 2009

Azerbaijan, 2008 - 2009
Get Microdata
Reference ID
AZE_2009_ES_v01_M_WB
DOI
https://doi.org/10.48529/4swa-8p88
Producer(s)
World Bank, European Bank for Reconstruction and Development
Collection(s)
Enterprise Surveys Fragility, Conflict and Violence
Metadata
DDI/XML JSON
Created on
Mar 24, 2011
Last modified
Sep 26, 2013
Page views
48390
Downloads
4475
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Azerbaijan2009_idstd

informal gift/payment expected or requested for an electrical connection? (c5)

Data file: Azerbaijan2009_idstd

Overview

Valid: 49
Invalid: 331
Type: Discrete
Decimal: 0
Start: 286
End: 287
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
In reference to that application for an electrical connection, was an informal gift or payment expected or requested?
Categories
Value Category Cases
-9 don't know 1
2%
-8 refusal 8
16.3%
1 yes 12
24.5%
2 no 28
57.1%
Sysmiss 331
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
1) Bribe for electrical connection. Self-explanatory
2) Sensitive question, no clarification can be offered
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.