The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / CHN_2012_ES_V01_M / variable [F1]
enterprise_surveys

Enterprise Survey 2012

China, 2011 - 2013
Get Microdata
Reference ID
CHN_2012_ES_v01_M
DOI
https://doi.org/10.48529/kc2d-0x45
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
DDI/XML JSON
Study website
Created on
Jul 25, 2013
Last modified
Sep 26, 2013
Page views
517834
Downloads
737857
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • China-2012-full
    ES N2700 data
  • China-2012-State
    Owned N148 data

F1. Output as a proportion of the maximun output possible if (f1)

Data file: China-2012-full ES N2700 data

Overview

Valid: 1693
Invalid: 1007
Type: Discrete
Decimal: 0
Start: 419
End: 421
Width: 3
Range: -9 - 100
Format: Numeric

Questions and instructions

Question pretext
READ THE FOLLOWING TO THE RESPONDENT BEFORE PROCEEDING: We now change the topic.
Literal question
In fiscal year 2011, what was this establishment's output produced as a proportion of the maximum output possible if using all facilities available (capacity utilization)?
Categories
Value Category Cases
-9 Don't know 36
2.1%
0 1
0.1%
7 1
0.1%
9 1
0.1%
10 1
0.1%
30 4
0.2%
35 2
0.1%
40 7
0.4%
45 1
0.1%
50 25
1.5%
55 1
0.1%
60 23
1.4%
65 3
0.2%
70 56
3.3%
75 14
0.8%
76 1
0.1%
78 2
0.1%
79 2
0.1%
80 282
16.7%
82 7
0.4%
83 2
0.1%
85 166
9.8%
86 11
0.6%
87 10
0.6%
88 32
1.9%
89 12
0.7%
90 537
31.7%
91 9
0.5%
92 20
1.2%
93 13
0.8%
94 8
0.5%
95 232
13.7%
96 15
0.9%
97 38
2.2%
98 25
1.5%
99 4
0.2%
100 89
5.3%
Sysmiss 1007
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
A capacity utilization estimate should be compared to a full production capacity capability.

This question only references the production facility and not the administrative offices.

Full production capacity is the maximum level of production that this establishment could reasonably expect to attain during regular working hours, and under normal and realistic operating conditions fully utilizing the machinery, equipment and employees in place.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.