The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / BGD_2013_ES_V01_M / variable [F1]
enterprise_surveys

Enterprise Survey 2013

Bangladesh, 2013
Get Microdata
Reference ID
BGD_2013_ES_v01_M
DOI
https://doi.org/10.48529/jqjw-m419
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Created on
Feb 04, 2014
Last modified
Feb 12, 2015
Page views
67392
Downloads
26877
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Bangladesh-2013-full
    data-

When You Applied For A Water Connection, Was An Informal Gift/payment Requested? (c14)

Data file: Bangladesh-2013-full data-

Overview

Valid: 29
Invalid: 1413
Type: Discrete
Decimal: 0
Start: 139
End: 140
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, was an informal gift or payment expected or requested?
Categories
Value Category Cases
-9 DON'T KNOW 0
0%
-8 REFUSE 2
6.9%
1 Yes 10
34.5%
2 No 17
58.6%
Sysmiss 1413
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
1) Bribe for water connection. Self-explanatory
2) Sensitive question, no clarification can be offered.

Others

Notes
In reference to that application for a water connection, was an informal gift or payment expected or requested?
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.