The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / AFG_2013_ES_V01_M / variable [F1]
enterprise_surveys

Enterprise Survey 2013

Afghanistan, 2013
Get Microdata
Reference ID
AFG_2013_ES_v01_M
DOI
https://doi.org/10.48529/qt13-e805
Producer(s)
World Bank
Collection(s)
Enterprise Surveys Fragility, Conflict and Violence
Metadata
Documentation in PDF DDI/XML JSON
Created on
Feb 19, 2014
Last modified
Feb 19, 2014
Page views
203254
Downloads
46625
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Afghanistan-2014-full
    data-

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Afghanistan-2014-full data-

Overview

Valid: 6
Invalid: 350
Minimum: -9
Maximum: 300
Type: Continuous
Decimal: 0
Start: 117
End: 119
Width: 3
Range: -9 - 300
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?

Others

Notes
C13. In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.