The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / UGA_2013_ES_V01_M / variable [F1]
enterprise_surveys

Enterprise Survey 2013

Uganda, 2013
Get Microdata
Reference ID
UGA_2013_ES_v01_M
DOI
https://doi.org/10.48529/v8h7-mj60
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Created on
Feb 21, 2014
Last modified
Feb 21, 2014
Page views
46039
Downloads
21841
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Uganda-2013-full
    data

Total Annual Expenditure For Purchases Of Land And Buildings In Last Fiscal Yr (n5b)

Data file: Uganda-2013-full data

Overview

Valid: 183
Invalid: 457
Type: Discrete
Decimal: 0
Start: 559
End: 569
Width: 11
Range: -9 - 20000000000
Format: Numeric

Questions and instructions

Literal question
In fiscal year [insert last complete fiscal year], how much did this establishment spend on purchases of: Land and buildings
Categories
Value Category Cases
-9 DK 33
18%
0 105
57.4%
4 1
0.5%
45 1
0.5%
1000000 1
0.5%
2000000 2
1.1%
2500000 2
1.1%
4000000 4
2.2%
4800000 1
0.5%
5000000 3
1.6%
6500000 1
0.5%
8500000 1
0.5%
9000000 3
1.6%
12000000 1
0.5%
12500000 1
0.5%
15000000 2
1.1%
16000000 1
0.5%
24000000 2
1.1%
34000000 1
0.5%
36000000 1
0.5%
40200000 1
0.5%
42000000 1
0.5%
50000000 1
0.5%
62410000 1
0.5%
80000000 1
0.5%
82400000 1
0.5%
100000000 1
0.5%
109000000 1
0.5%
150000000 1
0.5%
200000000 1
0.5%
548182845 1
0.5%
670000000 1
0.5%
2000000000 1
0.5%
4290000000 1
0.5%
10000000000 1
0.5%
20000000000 1
0.5%
Sysmiss 457
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
The category machinery, vehicles and equipment is the annual investment of anything used directly by this establishment to produce. Vehicles include transport and loading and unloading vehicles. It should include not only the purchase cost but also all other costs involved in the investment such as transport of the item and installation cost. Computer hardware should be considered under equipment

Land, buildings is the annual investment in land, buildings and structures used directly or indirectly by this establishment to produce goods and services.

Included are expenditures for new and used structures (including those under construction at the end of last complete fiscal year), fixtures and equipment, additions, major alterations and improvements to existing facilities, and capitalized repairs.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.