The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / UKR_2013_ES_V01_M / variable [F1]
enterprise_surveys

Enterprise Survey 2013

Ukraine, 2013
Get Microdata
Reference ID
UKR_2013_ES_v01_M
DOI
https://doi.org/10.48529/5v80-f962
Producer(s)
World Bank, European Bank for Reconstruction and Development
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 14, 2014
Last modified
May 15, 2014
Page views
28998
Downloads
6013
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Ukraine-2013-full
    data

Insufficient water supply for production over last fiscal yr? (c15)

Data file: Ukraine-2013-full data

Overview

Valid: 737
Invalid: 265
Type: Discrete
Decimal: 0
Start: 284
End: 285
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
Over fiscal year [insert last complete fiscal year], did this establishment experience insufficient water supply for production?
Categories
Value Category Cases
-9 Don't know 10
1.4%
-8 Refused 0
0%
-7 The establishment does not use water for production 12
1.6%
1 Yes 84
11.4%
2 No 631
85.6%
Sysmiss 265
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Insufficient water supply: whenever there is equipment failure or cessation of production operations due to the lack of or reduction in water supply.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.