The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / COD_2013_ES_V01_M / variable [F1]
enterprise_surveys

Enterprise Survey 2013

Congo, Dem. Rep., 2013 - 2014
Get Microdata
Reference ID
COD_2013_ES_v01_M
DOI
https://doi.org/10.48529/5m8d-d047
Producer(s)
World Bank
Collection(s)
Enterprise Surveys Fragility, Conflict and Violence
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jul 11, 2014
Last modified
Jul 21, 2014
Page views
26323
Downloads
9586
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • drc_2013_full_data

When You Applied For A Water Connection, Was An Informal Gift/payment Requested? (c14)

Data file: drc_2013_full_data

Overview

Valid: 34
Invalid: 495
Type: Discrete
Decimal: 0
Start: 172
End: 173
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, was an informal gift or payment expected or requested?
Categories
Value Category Cases
-9 DK 1
2.9%
-8 Refuse 1
2.9%
1 Yes 13
38.2%
2 No 19
55.9%
Sysmiss 495
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
1) Bribe for water connection. Self-explanatory
2) Sensitive question, no clarification can be offered.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.