The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / COD_2010_ES-P_V01_M / variable [F1]
enterprise_surveys

Enterprise Survey 2010-2013, Panel Data

Congo, Dem. Rep., 2010 - 2014
Get Microdata
Reference ID
COD_2010_ES-P_v01_M
DOI
https://doi.org/10.48529/y354-7a17
Producer(s)
World Bank
Collection(s)
Enterprise Surveys Fragility, Conflict and Violence
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jul 17, 2014
Last modified
Jul 17, 2014
Page views
44078
Downloads
15128
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • DRC_2010_2013_Panel

In last FY, What Was The Capacity Utilization (%) Of This Establishment? (f1)

Data file: DRC_2010_2013_Panel

Overview

Valid: 351
Invalid: 537
Type: Discrete
Decimal: 0
Start: 552
End: 554
Width: 3
Range: -9 - 100
Format: Numeric

Questions and instructions

Question pretext
READ THE FOLLOWING TO THE RESPONDENT BEFORE PROCEEDING: We now change the topic.
Literal question
In fiscal year 2009, what was this establishment's output produced as a proportion of the maximum output possible if using all facilities available (capacity utilization)?
Categories
Value Category Cases
-9 DK 41
11.7%
3 1
0.3%
4 1
0.3%
10 5
1.4%
15 3
0.9%
19 1
0.3%
20 5
1.4%
30 3
0.9%
40 3
0.9%
46 1
0.3%
50 10
2.8%
59 1
0.3%
60 21
6%
61 2
0.6%
65 4
1.1%
70 28
8%
71 1
0.3%
72 2
0.6%
75 13
3.7%
80 68
19.4%
82 1
0.3%
85 10
2.8%
86 1
0.3%
87 1
0.3%
88 1
0.3%
90 55
15.7%
92 1
0.3%
95 18
5.1%
97 1
0.3%
98 1
0.3%
99 1
0.3%
100 46
13.1%
Sysmiss 537
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
A capacity utilization estimate should be compared to a full production capacity capability.

This question only references the production facility and not the administrative offices.

Full production capacity is the maximum level of production that this establishment could reasonably expect to attain during regular working hours, and under normal and realistic operating conditions fully utilizing the machinery, equipment and employees in place.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.