The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / MDG_2013_ES_V01_M / variable [F1]
enterprise_surveys

Enterprise Survey 2013

Madagascar, 2013 - 2014
Get Microdata
Reference ID
MDG_2013_ES_v01_M
DOI
https://doi.org/10.48529/vk9w-ae07
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Oct 30, 2014
Last modified
Oct 30, 2014
Page views
41909
Downloads
6109
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • madagascar_2013_full_data

Wait for water connection (c13)

Data file: madagascar_2013_full_data

Overview

Valid: 29
Invalid: 503
Type: Discrete
Decimal: 0
Start: 266
End: 269
Width: 4
Range: -9 - 1095
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know 6
20.7%
-8 Refusal 0
0%
-7 Does not apply 0
0%
-6 5
17.2%
7 1
3.4%
10 2
6.9%
12 2
6.9%
15 1
3.4%
24 1
3.4%
30 2
6.9%
45 1
3.4%
60 1
3.4%
90 2
6.9%
100 1
3.4%
180 1
3.4%
365 1
3.4%
540 1
3.4%
1095 1
3.4%
Sysmiss 503
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for water connection. Self-explanatory
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.