The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / HUN_2013_ES_V01_M / variable [F1]
enterprise_surveys

Enterprise Survey 2013

Hungary, 2013
Get Microdata
Reference ID
HUN_2013_ES_v01_M
DOI
https://doi.org/10.48529/gfq3-ce68
Producer(s)
World Bank, European Bank for Reconstruction and Development
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Oct 30, 2014
Last modified
Oct 30, 2014
Page views
38349
Downloads
5848
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • hungary_2013_full_data

Insufficient water supply for production over last fiscal yr? (c15)

Data file: hungary_2013_full_data

Overview

Valid: 99
Invalid: 211
Type: Discrete
Decimal: 0
Start: 256
End: 257
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
Over fiscal year [insert last complete fiscal year], did this establishment experience insufficient water supply for production?
Categories
Value Category Cases
-9 don't know 0
0%
-8 refused 0
0%
-7 the establishment does not use water for production 4
4%
1 yes 0
0%
2 no 95
96%
Sysmiss 211
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Insufficient water supply: whenever there is equipment failure or cessation of production operations due to the lack of or reduction in water supply.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.