The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / GHA_2013_ES_V01_M / variable [F1]
enterprise_surveys

Enterprise Survey 2013

Ghana, 2012 - 2014
Get Microdata
Reference ID
GHA_2013_ES_v01_M
DOI
https://doi.org/10.48529/vmj4-zq89
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Oct 30, 2014
Last modified
Apr 28, 2015
Page views
94732
Downloads
28188
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • ghana_2013_full_data

Did You Experience Insufficient Water Supply For Production In Last Fiscal Yr? (c15)

Data file: ghana_2013_full_data

Overview

Valid: 377
Invalid: 343
Type: Discrete
Decimal: 0
Start: 164
End: 165
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
Over fiscal year [insert last complete fiscal year], did this establishment experience insufficient water supply for production?
Categories
Value Category Cases
-9 DK 8
2.1%
-7 The establishment does not use water for production 119
31.6%
1 Yes 74
19.6%
2 No 176
46.7%
Sysmiss 343
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Insufficient water supply: whenever there is equipment failure or cessation of production operations due to the lack of or reduction in water supply.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.