The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / TUR_2013_ES_V01_M / variable [F1]
enterprise_surveys

Enterprise Survey 2013

Turkiye, 2013 - 2014
Get Microdata
Reference ID
TUR_2013_ES_v01_M
DOI
https://doi.org/10.48529/z5kc-c064
Producer(s)
World Bank, European Bank for Reconstruction and Development
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Oct 30, 2014
Last modified
Jun 13, 2022
Page views
38294
Downloads
8618
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • turkey_2013_full_data

Average duration of incidents of insufficient water supply (c17)

Data file: turkey_2013_full_data

Overview

Valid: 190
Invalid: 1154
Type: Discrete
Decimal: 0
Start: 292
End: 293
Width: 2
Range: -9 - 45
Format: Numeric

Questions and instructions

Literal question
How long did these incidents of insufficient water supply last on average?
Categories
Value Category Cases
-9 Don't know 5
2.6%
-8 Refused 0
0%
1 104
54.7%
2 39
20.5%
3 18
9.5%
4 4
2.1%
5 6
3.2%
6 3
1.6%
10 2
1.1%
12 4
2.1%
20 2
1.1%
24 2
1.1%
45 1
0.5%
Sysmiss 1154
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Duration of a water shortage can be estimated by considering the average duration of water insufficiencies that took place in a typical month.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.