The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / MCC / LSO_2011_MCC-ES_V01_M / variable [F1]
MCC

Enterprise Survey 2011

Lesotho, 2011
Get Microdata
Reference ID
LSO_2011_MCC-ES_v01_M
Producer(s)
National University of Lesotho,
Collection(s)
Millennium Challenge Corporation (MCC)
Metadata
Documentation in PDF DDI/XML JSON
Created on
Jun 01, 2015
Last modified
Jun 01, 2015
Page views
25889
Downloads
260993
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Enterprise
    Survey Round I

Why is the enterprise not connected to WASCO/WASA water supply? (c2_17)

Data file: Enterprise Survey Round I

Overview

Valid: 679
Invalid: 0
Type: Discrete
Decimal: 0
Start: 254
End: 258
Width: 5
Range: -9999 - 9
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9999 Dont know 43
6.3%
-8888 Not applicable 310
45.7%
-6666 Missing 0
0%
1 Application in process 7
1%
2 Application denied 2
0.3%
3 No WASCO/WASA water supply in the area 274
40.4%
4 Do not need water 0
0%
5 WASA is unreliable 21
3.1%
6 Disconnected 10
1.5%
7 Cant afford 0
0%
8 Do not use water very much 1
0.1%
9 Not aware of WASA 11
1.6%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.