The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / SLV_2016_ES_V01_M / variable [F2]
enterprise_surveys

Enterprise Survey 2016

El Salvador, 2016
Get Microdata
Reference ID
SLV_2016_ES_v01_M
DOI
https://doi.org/10.48529/jtjx-h782
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Apr 19, 2017
Last modified
Apr 19, 2017
Page views
30395
Downloads
1697
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • elsalvador_2016_full_data

Did You Experience Insufficient Water Supply For Production In Last Fiscal Yr? (c15)

Data file: elsalvador_2016_full_data

Overview

Valid: 405
Invalid: 314
Type: Discrete
Decimal: 0
Start: 248
End: 249
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
Over fiscal year [insert last complete fiscal year], did this establishment experience insufficient water supply for production?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-7 Does not apply 38
9.4%
1 Yes 78
19.3%
2 No 289
71.4%
Sysmiss 314
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Insufficient water supply: whenever there is equipment failure or cessation of production operations due to the lack or reduction of water supply.
Question post text
If answer is No or Don't Know then GO TO QUESTION C.18
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.