The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / BEN_2004-2016_ES-P_V01_M / variable [F3]
enterprise_surveys

Enterprise Survey 2004-2009-2016, Panel Data

Benin, 2004 - 2016
Get Microdata
Reference ID
BEN_2004-2016_ES-P_v01_M
DOI
https://doi.org/10.48529/fs0w-w662
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 03, 2017
Last modified
May 03, 2017
Page views
66337
Downloads
4128
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Benin_2004_2009_2016

Did You Experience Insufficient Water Supply For Production In Last Fiscal Yr? (c15)

Data file: Benin_2004_2009_2016

Overview

Valid: 341
Invalid: 156
Type: Discrete
Decimal: 0
Start: 242
End: 243
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
Over fiscal year 2008, did this establishment experience insufficient water supply for production?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-7 Does not apply 8
2.3%
1 Yes 131
38.4%
2 No 202
59.2%
Sysmiss 156
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Insufficient water supply: whenever there is equipment failure or cessation of production operations due to the lack of or reduction in water supply.
Question post text
If answer is No or Don't Know then GO TO QUESTION C.19
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.