The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / SLV_2006-2016_ES-P_V01_M / variable [F5]
enterprise_surveys

Enterprise Survey 2006-2010-2016, Panel Data

El Salvador, 2006 - 2016
Get Microdata
Reference ID
SLV_2006-2016_ES-P_v01_M
DOI
https://doi.org/10.48529/j0f7-mn33
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 12, 2017
Last modified
Sep 11, 2017
Page views
31990
Downloads
4775
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • ElSalvador_2006_2010_2016

In Last Fy, What Was The Capacity Utilization (%) Of This Establishment? (f1)

Data file: ElSalvador_2006_2010_2016

Overview

Valid: 967
Invalid: 805
Type: Discrete
Decimal: 0
Start: 1780
End: 1782
Width: 3
Range: -9 - 100
Format: Numeric

Questions and instructions

Literal question
In percentage terms, in fiscal year [insert last complete fiscal year], what was this establishment's output produced as a proportion of the maximum output possible if using all the resources available, that is to say capacity utilization?
Categories
Value Category Cases
-9 Don't know (spontaneous) 7
0.7%
3 1
0.1%
5 1
0.1%
8 1
0.1%
10 8
0.8%
15 3
0.3%
20 12
1.2%
25 6
0.6%
30 29
3%
33 1
0.1%
35 3
0.3%
38 1
0.1%
40 38
3.9%
42 1
0.1%
45 7
0.7%
47 1
0.1%
50 74
7.7%
55 2
0.2%
60 120
12.4%
64 1
0.1%
65 13
1.3%
66 2
0.2%
70 121
12.5%
72 1
0.1%
75 72
7.4%
76 3
0.3%
78 2
0.2%
80 156
16.1%
82 3
0.3%
83 1
0.1%
84 1
0.1%
85 46
4.8%
87 2
0.2%
88 1
0.1%
89 1
0.1%
90 84
8.7%
92 1
0.1%
93 1
0.1%
95 24
2.5%
98 1
0.1%
99 1
0.1%
100 113
11.7%
Sysmiss 805
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
A capacity utilization estimate should be compared to a full production capacity capability. This question only references the production facility and not the administrative offices. Full production capacity is the maximum level of production that this establishment could reasonably expect to attain under normal and realistic operating conditions fully utilizing the machinery, equipment and employees in place
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.