The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / SLV_2006-2016_ES-P_V01_M / variable [F5]
enterprise_surveys

Enterprise Survey 2006-2010-2016, Panel Data

El Salvador, 2006 - 2016
Get Microdata
Reference ID
SLV_2006-2016_ES-P_v01_M
DOI
https://doi.org/10.48529/j0f7-mn33
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 12, 2017
Last modified
Sep 11, 2017
Page views
31844
Downloads
4773
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • ElSalvador_2006_2010_2016

Hypothetical cost to purchase its own machinery vehicles and equipment in use (Ln7b)

Data file: ElSalvador_2006_2010_2016

Overview

Valid: 437
Invalid: 1335
Minimum: -9
Maximum: 200000000
Type: Continuous
Decimal: 0
Start: 3701
End: 3709
Width: 9
Range: -9 - 200000000
Format: Numeric

Questions and instructions

Literal question
If this establishment had to hypothetically purchase its own land and buildings, and machinery and equipment in use now, as they are in their current condition, how much would it cost to purchase each of the following?
Land and buildings
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.