The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / TUR_2015_RES_V01_M / variable [F2]
enterprise_surveys

Regional Enterprise Survey 2015

Turkiye, 2015 - 2016
Get Microdata
Reference ID
TUR_2015_RES_v01_M
DOI
https://doi.org/10.48529/cad3-nr58
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Sep 06, 2017
Last modified
Jun 13, 2022
Page views
27705
Downloads
2699
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • turkey_2015_full_data

In last FY, What Was The Capacity Utilization (%) Of This Establishment? (f1)

Data file: turkey_2015_full_data

Overview

Valid: 2995
Invalid: 3011
Type: Discrete
Decimal: 0
Start: 973
End: 975
Width: 3
Range: -9 - 100
Format: Numeric

Questions and instructions

Literal question
In fiscal year [insert last complete fiscal year], what was this establishment's output produced as a proportion of the maximum output possible if using all facilities available (capacity utilization)?
Categories
Value Category Cases
-9 Don't know (spontaneous) 205
6.8%
0 5
0.2%
1 1
0%
5 7
0.2%
7 1
0%
8 2
0.1%
10 22
0.7%
12 1
0%
13 1
0%
15 2
0.1%
18 1
0%
20 32
1.1%
22 1
0%
23 1
0%
25 17
0.6%
30 61
2%
34 1
0%
35 11
0.4%
40 88
2.9%
45 14
0.5%
46 1
0%
50 196
6.5%
55 15
0.5%
56 1
0%
58 2
0.1%
59 1
0%
60 251
8.4%
65 27
0.9%
66 1
0%
68 1
0%
70 328
11%
71 1
0%
74 2
0.1%
75 103
3.4%
78 3
0.1%
80 327
10.9%
82 1
0%
85 55
1.8%
87 1
0%
88 1
0%
90 137
4.6%
95 30
1%
98 1
0%
100 1035
34.6%
Sysmiss 3011
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
A capacity utilization estimate should be compared to a full production capacity capability.

This question only references the production facility and not the administrative offices.

Full production capacity is the maximum level of production that this establishment could reasonably expect to attain during regular working hours, and under normal and realistic operating conditions fully utilizing the machinery, equipment and employees in place.

Others

Notes
f1.In fiscal year 2014, what was this establishment’s output produced as a proportion of the maximum output possible if using all the resources available (capacity utilization)?
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.