The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / TCD_2018_ES_V01_M / variable [F1]
enterprise_surveys

Enterprise Survey 2018

Chad, 2018
Get Microdata
Reference ID
TCD_2018_ES_v01_M
DOI
https://doi.org/10.48529/mxr6-ny48
Producer(s)
The World Bank
Collection(s)
Enterprise Surveys Fragility, Conflict and Violence
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Nov 12, 2018
Last modified
Nov 12, 2018
Page views
27875
Downloads
2191
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • chad_2018_full_data

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: chad_2018_full_data

Overview

Valid: 14
Invalid: 139
Type: Continuous
Decimal: 0
Start: 152
End: 153
Width: 2
Range: -9 - 60
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received? Wait for water connection
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 1
50%
-5 Application denied 0
0%
1 One minute or less 1
50%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.