The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / ARG_2006-2017_ES-P_V01_M / variable [F2]
enterprise_surveys

Enterprise survey 2006-2017, Panel data

Argentina, 2006 - 2017
Get Microdata
Reference ID
ARG_2006-2017_ES-P_v01_M
DOI
https://doi.org/10.48529/grx5-4g86
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 08, 2019
Last modified
Jan 08, 2019
Page views
53550
Downloads
5514
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Argentina_2006_2010_2017

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: Argentina_2006_2010_2017

Overview

Valid: 704
Invalid: 2404
Minimum: -9
Maximum: 730
Type: Discrete
Decimal: 0
Start: 362
End: 364
Width: 3
Range: -9 - 730
Format: Numeric

Questions and instructions

Literal question
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 94
13.4%
-7 Never regiestered (spontaneous) 0
0%
-6 Still in process 31
4.4%
-5 Application denied 6
0.9%
1 One year or less 32
4.5%
2 26
3.7%
3 20
2.8%
4 5
0.7%
5 25
3.6%
6 5
0.7%
7 66
9.4%
10 32
4.5%
13 1
0.1%
14 4
0.6%
15 49
7%
20 20
2.8%
24 1
0.1%
25 1
0.1%
30 84
11.9%
35 2
0.3%
40 12
1.7%
45 12
1.7%
60 53
7.5%
70 1
0.1%
75 1
0.1%
90 50
7.1%
100 1
0.1%
120 12
1.7%
150 6
0.9%
180 27
3.8%
200 1
0.1%
210 3
0.4%
240 3
0.4%
250 1
0.1%
270 2
0.3%
300 5
0.7%
360 2
0.3%
365 5
0.7%
720 1
0.1%
730 2
0.3%
Sysmiss 2404
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for an electrical connection: period in days between when the application was completed and submitted until the connection was provided.

Others

Notes
c4. How many days did it take for you to receive an electrical connection service?
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.