The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / VUT_2009_ES_V01_M_WB / variable [F1]
enterprise_surveys

Enterprise Survey 2009

Vanuatu, 2009
Get Microdata
Reference ID
VUT_2009_ES_v01_M_WB
DOI
https://doi.org/10.48529/w0jf-jz91
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
DDI/XML JSON
Created on
Mar 30, 2011
Last modified
Sep 26, 2013
Page views
31870
Downloads
3738
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Vanuatu
    2009-full data-

how many days did it take for you to obtain a water connection? (c13)

Data file: Vanuatu 2009-full data-

Overview

Valid: 26
Invalid: 102
Type: Discrete
Decimal: 0
Start: 137
End: 138
Width: 2
Range: -9 - 90
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know 0
0%
-6 Still in process 0
0%
-5 Application denied 1
3.8%
1 Less than 1 day 6
23.1%
2 4
15.4%
3 1
3.8%
4 2
7.7%
5 1
3.8%
7 5
19.2%
15 1
3.8%
21 4
15.4%
30 1
3.8%
Sysmiss 102
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for water connection. Self-explanatory
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.