The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / KAZ_2019_ES_V01_M / variable [F1]
enterprise_surveys

Enterprise Survey 2019

Kazakhstan, 2019
Get Microdata
Reference ID
KAZ_2019_ES_v01_M
DOI
https://doi.org/10.48529/k3nd-8s89
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Created on
Jul 13, 2020
Last modified
Jul 13, 2020
Page views
32651
Downloads
897
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • kazakhstan_2019_full_data.dta

Informal Gift/Payment Expected or Requested For An Electrical Connection? (c5)

Data file: kazakhstan_2019_full_data.dta

Overview

Valid: 183
Invalid: 1263
Minimum: -9
Maximum: 2
Type: Discrete
Decimal: 0
Start: 247
End: 248
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
In reference to that application for an electrical connection, was an informal gift or payment expected or requested?
Categories
Value Category Cases
-9 Don't know (spontaneous) 2
1.1%
-8 Refusal (spontaneous) 4
2.2%
1 Yes 14
7.7%
2 No 163
89.1%
Sysmiss 1263
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.