The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / NER_2018_MTF_V01_M / variable [F1]
central

Multi-Tier Framework for Measuring Energy Access 2018

Niger, 2018
Get Microdata
Reference ID
NER_2018_MTF_v01_M
DOI
https://doi.org/10.48529/4e69-q893
Producer(s)
Energy Sector Management Assistance Program (ESMAP)
Collection(s)
Fragility, Conflict and Violence
Metadata
Documentation in PDF DDI/XML JSON
Created on
Mar 30, 2021
Last modified
Nov 29, 2021
Page views
43913
Downloads
2010
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • MTF_HH_Characteristics.dta
  • MTF_HH_Roaster.dta
  • MTF_Solar_products.dta
  • MTF_Lighting.dta
  • MTF_Dry_Cell_Batteries.dta
  • MTF_Fuel_for_Cooking
  • MTF_Cooking_Solution.dta

D6.Consentiriez-vous à payer {} FCFA pour une connexion électrique si on vous a (D6)

Data file: MTF_HH_Characteristics.dta

Overview

Valid: 407
Invalid: 3642
Minimum: 1
Maximum: 888
Type: Discrete
Decimal: 0
Start: 1572
End: 1574
Width: 3
Range: 1 - 888
Format: Numeric

Questions and instructions

Literal question
D.6. Consentiriez-vous à payer {} FCFA pour une connexion électrique si on vous accorde douze mois pour faire le paiement ?
Categories
Value Category Cases
1 Oui 65
16%
2 Non 291
71.5%
888 Ne sait pas 51
12.5%
Sysmiss 3642
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.