The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / UGA_2006_ES_V01_M_WB / variable [F1]
enterprise_surveys

Enterprise Survey 2006

Uganda, 2006
Get Microdata
Reference ID
UGA_2006_ES_v01_M_WB
DOI
https://doi.org/10.48529/tpa6-z039
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
DDI/XML JSON
Created on
Apr 28, 2011
Last modified
Sep 26, 2013
Page views
58969
Downloads
1967
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Uganda2006_manufacturing_clean
  • Uganda2006_retail_and_it_clean
  • Uganda2006_residual_clean

At current tariff rates and fuel prices, is it more or less (g4u3)

Data file: Uganda2006_manufacturing_clean

Overview

Valid: 307
Invalid: 0
Type: Discrete
Decimal: 0
Start: 708
End: 710
Width: 3
Range: -99 - 3
Format: Numeric

Questions and instructions

Literal question
At current tariff rates and fuel prices, is it more or less expensive for you to generate power using your generator rather than to use power from the grid (when available)?
Categories
Value Category Cases
-99 Refused to answer 0
0%
-88 Not provided 0
0%
-77 Not applicable 0
0%
-66 Do not know 0
0%
-44 219
71.3%
1 More expensive to use generator 85
27.7%
2 About the same cost 0
0%
3 More expensive to use power from grid 3
1%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.