The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / IDN_2009_ES_V02_M_WB / variable [F2]
enterprise_surveys

Enterprise Survey 2009

Indonesia, 2009 - 2010
Get Microdata
Reference ID
IDN_2009_ES_v02_M_WB
DOI
https://doi.org/10.48529/ea4g-a158
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
DDI/XML JSON
Created on
Jul 18, 2011
Last modified
Sep 26, 2013
Page views
54813
Downloads
17944
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Indonesia
    2009-full data-

average length of water shortage (affecting production) in last fiscal year (c17)

Data file: Indonesia 2009-full data-

Overview

Valid: 31
Invalid: 1413
Type: Discrete
Decimal: 0
Start: 235
End: 236
Width: 2
Range: -9 - 6
Format: Numeric

Questions and instructions

Literal question
How long did these incidents of insufficient water supply last on average?
Categories
Value Category Cases
-9 Don't know 1
3.2%
1 Less than one hour 5
16.1%
2 4
12.9%
3 6
19.4%
4 3
9.7%
6 2
6.5%
7 1
3.2%
9 1
3.2%
10 2
6.5%
12 2
6.5%
14 1
3.2%
24 3
9.7%
Sysmiss 1413
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Duration of a water shortage can be estimated by considering the average duration of water insufficiencies that took place in a typical month.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.