The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • Collections
  • Citations
  • Terms of use
  • About
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / ZWE_2011_ES_V01_M_WB / variable [F1]
enterprise_surveys

Enterprise Survey 2011

Zimbabwe, 2011 - 2012
Get Microdata
Reference ID
ZWE_2011_ES_v01_M_WB
DOI
https://doi.org/10.48529/ctgb-1k86
Producer(s)
World Bank
Collection(s)
Enterprise Surveys Fragility, Conflict and Violence
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 10, 2012
Last modified
Apr 07, 2014
Page views
78542
Downloads
44508
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Zimbabwe-2011-full
    data-

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Zimbabwe-2011-full data-

Overview

Valid: 8
Invalid: 591
Type: Discrete
Decimal: 0
Start: 147
End: 149
Width: 3
Range: -9 - 120
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 do not know 0
0%
-6 still in process 0
0%
-5 application denied 0
0%
1 less than one day 0
0%
7 1
12.5%
10 1
12.5%
20 1
12.5%
30 1
12.5%
60 2
25%
109 1
12.5%
120 1
12.5%
Sysmiss 591
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for water connection. Self-explanatory
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.