The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • Collections
  • Citations
  • Terms of use
  • About
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / JAM_2010_ES_V01_M_WB / variable [F1]
enterprise_surveys

Enterprise Survey 2010

Jamaica, 2011
Get Microdata
Reference ID
JAM_2010_ES_v01_M_WB
DOI
https://doi.org/10.48529/6gg6-gn79
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
DDI/XML JSON
Created on
Dec 03, 2012
Last modified
Sep 26, 2013
Page views
34903
Downloads
5590
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Jamaica-2010-full
    data-

Average Length Of Water Shortages (Affecting Production) In Last Fiscal Year (c17)

Data file: Jamaica-2010-full data-

Overview

Valid: 9
Invalid: 367
Minimum: -8
Maximum: 24
Mean: 5.667
Standard deviation: 10.536
Type: Continuous
Decimal: 0
Start: 148
End: 149
Width: 2
Range: -8 - 24
Format: Numeric

Questions and instructions

Literal question
How long did these incidents of insufficient water supply last on average?
Interviewer instructions
Duration of water shortage can be estimated by considering the average duration of water insufficiencies that took place in a typical month.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.