Login
Login
The World Bank Working for a World Free of Poverty Microdata Library
  • Microdata Catalog
  • Terms of use
  • About
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / ARM_2013_ES_V01_M / variable [F1]
enterprise_surveys

Enterprise Survey 2013

Armenia, 2012 - 2013
Enterprise Surveys
Central
World Bank, European Bank for Reconstruction and Development
Created on June 17, 2014 Last modified June 17, 2014 Page views 25499 Download 5133 Documentation in PDF Study website Metadata DDI/XML JSON
  • Study description
  • Documentation
  • Data Description
  • Get Microdata
  • Data files
  • armenia_2013_full_data
CSV JSON

Informal gift/ payment expected/requested to obtain water connection? (c14)

Data file: armenia_2013_full_data

Overview

Valid: 9
Invalid: 351
Type: Discrete
Decimal: 0
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, was an informal gift or payment expected or requested?
Categories
Value Category Cases
-9 Don't know 0
0%
-8 Refused 0
0%
1 Yes 1
11.1%
2 No 8
88.9%
Sysmiss 351
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
var_qstn_ivuinstr
1) Bribe for water connection. Self-explanatory
2) Sensitive question, no clarification can be offered.
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.