The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / COD_2013_MS_V01_M / variable [F1]
enterprise_surveys

Micro-Enterprise Survey 2013

Congo, Dem. Rep., 2013 - 2014
Get Microdata
Reference ID
COD_2013_MS_v01_M
DOI
https://doi.org/10.48529/2ncv-7b54
Producer(s)
World Bank
Collection(s)
Enterprise Surveys Fragility, Conflict and Violence
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jul 11, 2014
Last modified
Jul 11, 2014
Page views
35731
Downloads
2787
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • drc_micro_2013_full_data

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: drc_micro_2013_full_data

Overview

Valid: 5
Invalid: 407
Type: Discrete
Decimal: 0
Start: 138
End: 139
Width: 2
Range: -9 - 7
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 DK 1
20%
-6 Still in process 1
20%
-5 Application denied 0
0%
1 Less than one day 0
0%
3 1
20%
5 1
20%
7 1
20%
Sysmiss 407
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for water connection. Self-explanatory
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.