The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / IND_2014_ES_V01_M / variable [F2]
enterprise_surveys

Enterprise Survey 2014

India, 2013 - 2014
Get Microdata
Reference ID
IND_2014_ES_v01_M
DOI
https://doi.org/10.48529/kqgv-2v89
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Feb 12, 2015
Last modified
Oct 08, 2015
Page views
84175
Downloads
29276
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • india_2014_full_data_

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: india_2014_full_data_

Overview

Valid: 528
Invalid: 8753
Type: Discrete
Decimal: 0
Start: 709
End: 711
Width: 3
Range: -9 - 365
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 DONT KNOW (SPONTANEOUS) 16
3%
-6 STILL IN PROCESS 31
5.9%
-5 APPLICATION DENIED 3
0.6%
1 LESS THAN ONE DAY 27
5.1%
2 2
0.4%
3 6
1.1%
4 3
0.6%
5 6
1.1%
6 3
0.6%
7 12
2.3%
8 2
0.4%
9 2
0.4%
10 12
2.3%
12 3
0.6%
13 1
0.2%
14 3
0.6%
15 22
4.2%
16 2
0.4%
18 2
0.4%
20 54
10.2%
21 1
0.2%
22 4
0.8%
23 2
0.4%
24 2
0.4%
25 48
9.1%
26 1
0.2%
28 27
5.1%
30 147
27.8%
31 1
0.2%
35 6
1.1%
40 14
2.7%
41 3
0.6%
45 9
1.7%
60 21
4%
70 2
0.4%
75 1
0.2%
90 10
1.9%
100 1
0.2%
110 1
0.2%
120 4
0.8%
180 5
0.9%
190 1
0.2%
300 1
0.2%
345 1
0.2%
365 3
0.6%
Sysmiss 8753
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Waiting time for construction permit. Self-explanatory

Others

Notes
G3 In reference to that application for a construction-related permit, approximately how many days did it take to obtain
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.