The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / MWI_2014_ES_V01_M / variable [F3]
enterprise_surveys

Enterprise Survey 2014

Malawi, 2014 - 2015
Get Microdata
Reference ID
MWI_2014_ES_v01_M
DOI
https://doi.org/10.48529/kakc-2w02
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Created on
Oct 07, 2015
Last modified
Oct 07, 2015
Page views
29251
Downloads
3105
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • malawi_2014_full_data

Average Length Of Water Shortages (Affecting Production) In Last Fiscal Year (c17)

Data file: malawi_2014_full_data

Overview

Valid: 51
Invalid: 472
Type: Discrete
Decimal: 0
Start: 265
End: 266
Width: 2
Range: -9 - 24
Format: Numeric

Questions and instructions

Literal question
How long did these incidents of insufficient water supply last on average?
Categories
Value Category Cases
-9 DON’T KNOW (SPONTANEOUS) 1
2%
1 LESS THAN ONE HOUR 4
7.8%
2 6
11.8%
3 9
17.6%
4 3
5.9%
5 2
3.9%
6 12
23.5%
8 3
5.9%
9 4
7.8%
10 1
2%
12 3
5.9%
24 3
5.9%
Sysmiss 472
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Duration of a water shortage can be estimated by considering the average duration of water insufficiencies that took place in a typical month.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.