Value | Category | Cases | |
---|---|---|---|
BUMG/SPP PERTANIAN (2010) | 1 |
3.3%
|
|
BUMK (PENGADAAN MESIN PERONTOK PADI (2 UNIT) DAN MESIN KIPAS (1 UNIT) | 1 |
3.3%
|
|
GEDUNG TPA 2009/2010 | 1 |
3.3%
|
|
MCK (2008), SEBELAH TIMUR MASJID BABURRAHMAN +/- 5 METER | 1 |
3.3%
|
|
PEMBANGUNAN BENDUNGAN (2009) SEBELAH TIMUR KAMPUNG DUSUN 1 +/- 400 MET | 1 |
3.3%
|
|
PEMBANGUNAN JALAN JEMBATAN (2012) | 1 |
3.3%
|
|
PEMBUATAN BODI JALAN (JALAN BARU) | 1 |
3.3%
|
|
PEMBUKAAN JALAN (2009) | 1 |
3.3%
|
|
PEMBUKAAN JALAN ARAH TIMUR POSKESDES | 1 |
3.3%
|
|
PEMBUKAAN JALAN BARU 2009 | 1 |
3.3%
|
|
PENGERASAN JALAN (2010) | 1 |
3.3%
|
|
PENGERASAN JALAN (2011) | 1 |
3.3%
|
|
RABAT BETON | 1 |
3.3%
|
|
RABAT BETON (2011), SEBELAH BARAT MESJID DUSUN BEMONG +/- 35 M | 1 |
3.3%
|
|
SALURAN BETON (2011) | 1 |
3.3%
|
|
SALURAN IRIGASI (2012) | 1 |
3.3%
|
|
SALURAN IRIGASI 2012 | 1 |
3.3%
|
|
SALURAN IRIGASI(2011) | 1 |
3.3%
|
|
SALURAN PEMBUANG DAN TALUD 2009 | 1 |
3.3%
|
|
SALURAN PEMBUANGAN(2010) | 1 |
3.3%
|
|
SALURAN/SPAL | 1 |
3.3%
|
|
SARANA AIR BERSIH | 1 |
3.3%
|
|
SPP | 1 |
3.3%
|
|
SPP (2008) | 1 |
3.3%
|
|
SPP (2010) | 1 |
3.3%
|
|
SPP (2011) | 1 |
3.3%
|
|
SPP (2012) | 1 |
3.3%
|
|
SPP (PINJAMAN MODAL USAHA) | 1 |
3.3%
|
|
SPP BKPG (2008-2013) | 1 |
3.3%
|
|
TALUD JALAN(2009) | 1 |
3.3%
|
This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.