The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • Collections
  • Citations
  • Terms of use
  • About
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / MYS_2015_ES_V01_M / variable [F5]
enterprise_surveys

Enterprise Survey 2015

Malaysia, 2015 - 2016
Get Microdata
Reference ID
MYS_2015_ES_v01_M
DOI
https://doi.org/10.48529/b122-ej84
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Mar 30, 2017
Last modified
Mar 30, 2017
Page views
36006
Downloads
2447
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • malaysia_2015_full_data

Total Annual Expenditure For Purchases Of Land And Buildings In Last Fiscal Yr (n5b)

Data file: malaysia_2015_full_data

Overview

Valid: 186
Invalid: 814
Type: Discrete
Decimal: 0
Start: 875
End: 883
Width: 9
Range: -9 - 450000000
Format: Numeric

Questions and instructions

Literal question
In fiscal year [insert last complete fiscal year], how much did this establishment spend on purchases of:
Land and buildings
Categories
Value Category Cases
-9 Don't know (spontaneous) 5
2.7%
-8 Refusal (spontaneous) 0
0%
-7 Does not apply 0
0%
0 102
54.8%
9 2
1.1%
5000 2
1.1%
9999 2
1.1%
10000 3
1.6%
50000 3
1.6%
59000 1
0.5%
80000 1
0.5%
100000 1
0.5%
200000 5
2.7%
250000 2
1.1%
300000 1
0.5%
450000 2
1.1%
500000 4
2.2%
800000 1
0.5%
1000000 16
8.6%
1590000 1
0.5%
2000000 3
1.6%
3000000 2
1.1%
3500000 1
0.5%
4500000 12
6.5%
4560000 2
1.1%
5000000 2
1.1%
5550000 1
0.5%
6000000 1
0.5%
10000000 2
1.1%
25000000 1
0.5%
35000000 1
0.5%
45000000 1
0.5%
45600000 1
0.5%
50000000 1
0.5%
450000000 1
0.5%
Sysmiss 814
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
The category machinery, vehicles and equipment is the annual investment of anything used directly by this establishment to produce. Vehicles include transport and loading and unloading vehicles. It should include not only the purchase cost but also all other costs involved in the investment such as transport of the item and installation cost. Computer hardware should be considered under equipment

Land, buildings is the annual investment in land, buildings and structures used directly or indirectly by this establishment to produce goods and services.

Included are expenditures for new and used structures (including those under construction at the end of last complete fiscal year), fixtures and equipment, additions, major alterations and improvements to existing facilities, and capitalized repairs.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.