The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / THA_2016_ES_V01_M / variable [F6]
enterprise_surveys

Enterprise Survey 2016

Thailand, 2015 - 2016
Get Microdata
Reference ID
THA_2016_ES_v01_M
DOI
https://doi.org/10.48529/drya-x355
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Mar 30, 2017
Last modified
Mar 30, 2017
Page views
35804
Downloads
20781
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • thailand_2016_full_data

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: thailand_2016_full_data

Overview

Valid: 16
Invalid: 984
Type: Discrete
Decimal: 0
Start: 233
End: 234
Width: 2
Range: -9 - 45
Format: Numeric

Questions and instructions

Literal question
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 3
18.8%
-8 Refusal (spontaneous) 0
0%
-7 Does not apply 0
0%
-6 1
6.3%
-5 1
6.3%
1 2
12.5%
2 1
6.3%
5 1
6.3%
7 4
25%
15 1
6.3%
30 1
6.3%
45 1
6.3%
Sysmiss 984
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for electrical connection. Self-explanatory
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.