The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / TLS_2015_ES_V01_M / variable [F6]
enterprise_surveys

Enterprise Survey 2015

Timor-Leste, 2015 - 2016
Get Microdata
Reference ID
TLS_2015_ES_v01_M
DOI
https://doi.org/10.48529/mb89-s086
Producer(s)
World Bank
Collection(s)
Enterprise Surveys Fragility, Conflict and Violence
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Mar 30, 2017
Last modified
Mar 30, 2017
Page views
33894
Downloads
1746
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • timor_leste_2015_full_data

In last FY, What Was The Capacity Utilization (%) Of This Establishment? (f1)

Data file: timor_leste_2015_full_data

Overview

Valid: 60
Invalid: 66
Type: Discrete
Decimal: 0
Start: 605
End: 607
Width: 3
Range: -9 - 100
Format: Numeric

Questions and instructions

Question pretext
READ THE FOLLOWING TO THE RESPONDENT BEFORE PROCEEDING: We now change the topic.
Literal question
In fiscal year [insert last complete fiscal year], what was this establishment's output produced as a proportion of the maximum output possible if using all facilities available (capacity utilization)?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-8 Refusal (spontaneous) 0
0%
-7 Does not apply 0
0%
2 1
1.7%
20 1
1.7%
25 4
6.7%
30 2
3.3%
35 2
3.3%
40 1
1.7%
50 8
13.3%
55 1
1.7%
60 3
5%
63 1
1.7%
65 1
1.7%
70 3
5%
75 3
5%
80 8
13.3%
85 5
8.3%
90 4
6.7%
100 12
20%
Sysmiss 66
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
A capacity utilization estimate should be compared to a full production capacity capability.

This question only references the production facility and not the administrative offices.

Full production capacity is the maximum level of production that this establishment could reasonably expect to attain during regular working hours, and under normal and realistic operating conditions fully utilizing the machinery, equipment and employees in place.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.