The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / TON_2009_ES_V01_M_WB / variable [F1]
enterprise_surveys

Enterprise Survey 2009

Tonga, 2009
Get Microdata
Reference ID
TON_2009_ES_v01_M_WB
DOI
https://doi.org/10.48529/0cvn-ky98
Producer(s)
World Bank
Collection(s)
Enterprise Surveys
Metadata
DDI/XML JSON
Created on
Mar 30, 2011
Last modified
Sep 26, 2013
Page views
32971
Downloads
3224
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Tonga 2009-full
    data-

informal gift/payment expected or requested for a construction-related permit (g4)

Data file: Tonga 2009-full data-

Overview

Valid: 33
Invalid: 117
Type: Discrete
Decimal: 0
Start: 349
End: 350
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, was an informal gift or payment expected or requested?
Categories
Value Category Cases
-9 Don't know 6
18.2%
-8 REF 2
6.1%
1 Yes 7
21.2%
2 No 18
54.5%
Sysmiss 117
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
1) Bribe for construction permit. Self-explanatory
2) Sensitive question, no clarification can be offered
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.