The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / UKR_2008_ES_V01_M_WB / variable [F1]
enterprise_surveys

Enterprise Survey 2008

Ukraine, 2008
Get Microdata
Reference ID
UKR_2008_ES_v01_M_WB
DOI
https://doi.org/10.48529/vkc2-fq91
Producer(s)
World Bank, European Bank for Reconstruction and Development
Collection(s)
Enterprise Surveys
Metadata
DDI/XML JSON
Created on
Mar 30, 2011
Last modified
Sep 26, 2013
Page views
24749
Downloads
2840
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Ukraine-2008--full
    data-5

in 2007, what was the % capacity utilization of this establishment? (f1)

Data file: Ukraine-2008--full data-5

Overview

Valid: 487
Invalid: 364
Type: Discrete
Decimal: 0
Start: 697
End: 699
Width: 3
Range: -9 - 100
Format: Numeric

Questions and instructions

Literal question
In fiscal year 2007, what was this establishment's output produced as a proportion of the maximum output possible if using all facilities available (capacity utilization)?
Categories
Value Category Cases
-9 don't know 27
5.5%
2 1
0.2%
5 1
0.2%
9 1
0.2%
10 3
0.6%
15 2
0.4%
20 3
0.6%
22 1
0.2%
23 1
0.2%
25 2
0.4%
30 6
1.2%
32 1
0.2%
35 2
0.4%
40 10
2.1%
50 32
6.6%
55 2
0.4%
59 2
0.4%
60 39
8%
65 5
1%
67 1
0.2%
68 2
0.4%
70 48
9.9%
74 1
0.2%
75 9
1.8%
76 1
0.2%
80 73
15%
82 2
0.4%
83 1
0.2%
84 1
0.2%
85 9
1.8%
86 1
0.2%
87 2
0.4%
88 1
0.2%
90 55
11.3%
91 1
0.2%
93 1
0.2%
94 1
0.2%
95 7
1.4%
96 3
0.6%
98 4
0.8%
100 122
25.1%
Sysmiss 364
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
A capacity utilization estimate should be compared to a full production capacity capability.

This question only references the production facility and not the administrative offices.

Full production capacity is the maximum level of production that this establishment could reasonably expect to attain during regular working hours, and under normal and realistic operating conditions fully utilizing the machinery, equipment and employees in place.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.