Value | Category | Cases | |
---|---|---|---|
BAD TERRAIN DUE TO HEAVY RAINS | 1 |
1.5%
|
|
BAD WEATHER | 4 |
6%
|
|
CHALLENGE IN BUDGET TOP BOTTOM KIND OF PLANNING | 1 |
1.5%
|
|
COMPESATION MONEY ISNT AVAILABLE, POOR ADMINISTRATION IN LOCAL GOVERNMENT | 1 |
1.5%
|
|
CONSTANT BREAKDOWN OF EQUIPMENTS | 1 |
1.5%
|
|
Compesation procedures | 1 |
1.5%
|
|
DELAY BY CONTRACTOR | 1 |
1.5%
|
|
DELAY BY CONTRACTORS | 1 |
1.5%
|
|
DELAY IN PROCUREMENT PROCESS | 1 |
1.5%
|
|
FREQUENT BREAK DOWN OF EQUIPMENT AND HIGH COST OF REPAIR A ND DELAYED RESPONSE TO REPAIRS | 1 |
1.5%
|
|
FREQUENT BREAK DOWN OF MACHINES | 1 |
1.5%
|
|
HEAVY VEHICLES | 1 |
1.5%
|
|
Hilly areas | 1 |
1.5%
|
|
IGNORANCE OF THE COMMUNITIY | 1 |
1.5%
|
|
Inadequate equipments | 1 |
1.5%
|
|
LACK OF EQUIPMENTS | 1 |
1.5%
|
|
LACK OF SUPERVISION BY ROAD INSPECTORS | 1 |
1.5%
|
|
LONG PROCUREMENT PROCESS | 2 |
3%
|
|
Lack of Grader | 1 |
1.5%
|
|
Lack of a grader | 1 |
1.5%
|
|
Lack of equipment | 2 |
3%
|
|
Local govement poor policy | 1 |
1.5%
|
|
MISUSE OF THE ROADS | 1 |
1.5%
|
|
Misuse of roads by the community | 1 |
1.5%
|
|
NO FUND FOR COMPENSATION | 1 |
1.5%
|
|
Nature of land is Hilly | 1 |
1.5%
|
|
Nature of land(Hilly) | 1 |
1.5%
|
|
No grader | 1 |
1.5%
|
|
POLITICAL INTERFERANCE | 1 |
1.5%
|
|
POOR IMPLEMENTATION | 1 |
1.5%
|
|
POOR SOIL TEXTURE | 1 |
1.5%
|
|
POOR SOILS | 1 |
1.5%
|
|
POOR SUPERVISION BY THE DISTRICT LEADS TO SHOODY WORK | 1 |
1.5%
|
|
POOR TYPE OF SOIL | 1 |
1.5%
|
|
POOR USAGE OF ROADS BY THE COMMUNITY | 2 |
3%
|
|
Poor road equipment | 1 |
1.5%
|
|
SHOODY CONSTRUCTION | 1 |
1.5%
|
|
SHOODY WORK ON DISTRICT ROADS BY THE DISTRICT | 1 |
1.5%
|
|
STRICT GUIDE BY THE ROAD FUND | 2 |
3%
|
|
STRINGS ATTACHED TO THE ROAD FUNDS | 1 |
1.5%
|
|
Swampy areas | 1 |
1.5%
|
|
TERRAIN | 1 |
1.5%
|
|
TYPE OF TERRAIN | 1 |
1.5%
|
|
TYPE OF TERRAIN, BEING HILLY | 1 |
1.5%
|
|
TYPE OF THE TERRAIN, FLOODS AND RIVER FLOWS | 1 |
1.5%
|
|
Weak road equipment | 2 |
3%
|
|
bad weather | 1 |
1.5%
|
|
guideline regarding the use of the money is not sufficient for the people | 1 |
1.5%
|
|
high costs of materials | 1 |
1.5%
|
|
lack of a grader | 1 |
1.5%
|
|
lack of equipment | 2 |
3%
|
|
lack of equipments | 2 |
3%
|
|
lack of equipments and poor weather | 1 |
1.5%
|
|
lack of supervion by the district | 1 |
1.5%
|
|
miscultulation by the tecnical team | 1 |
1.5%
|
|
poor soil texture | 1 |
1.5%
|
|
poor supervision by the engineers | 1 |
1.5%
|