The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / IMPACT_EVALUATION / LBR_2015_HRBFIE-BL_V01_M
impact_evaluation

Health Systems Strengthening Project Impact Evaluation 2015, Baseline Survey

Liberia, 2013 - 2015
Get Microdata
Reference ID
LBR_2015_HRBFIE-BL_v01_M
DOI
https://doi.org/10.48529/evqc-pg35
Producer(s)
Kenneth Leonard (University of Maryland), Luke Bawo, Rianna Mohammed-Roberts
Collection(s)
Impact Evaluation Surveys
Metadata
Documentation in PDF DDI/XML JSON
Created on
Jan 13, 2020
Last modified
Jan 13, 2020
Page views
312641
Downloads
258
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • f_do_2_nonames
  • f_do_1
  • f_v_2
  • ipc
  • o_do_1
  • o_do_2
  • o_v_1_a
  • o_v_1_b
  • o_v_2_a
  • o_v_2_b
  • o_v_3
  • o_v_4_a
  • o_v_4_b
  • o_x
  • p_do_1
  • p_do_2
  • p_know_can_do
  • p_v_1
  • p_v_2
  • p_v_3
  • p_v_4
  • p_x
  • s_do_1
  • s_do_2
  • s_v_1_a
  • s_v_1_b
  • s_v_2_a
  • s_v_2_b
  • s_v_3
  • s_v_5_a
  • s_v_5_b
  • s_x

Data file: p_know_can_do

Cases: 2552
Variables: 34

Variables

round
First (2013) or Second (2015) data collection round
facility
ind_id1
ind_id2
ind_id3
ind_id4
ind_id5
patient_id
date
history
Pediatric Observation History Taking Score
physical
Pediatric Observation Physical Examination Score
total_inputs
Pediatric Observation History Taking and Physical Exam
education
Pediatric Observation Health Education Score
effort
Pediatric Observation General Effort Score
ind_id
p_v_quality
empirical Bayes means for Quality
p_v_total
factor1
I can make a difference
factor2
This hospital and management provide the right tools
factor3
In this organization, I am taken seriously
factor4
I am keen to improve
factor5
Feedback, teamwork, recognition
total_score
Total Score
infra_score
Average of necessary equipment present
infra_works
Average of necessary equipment working
infra_notworking
Proportion of infrastructure present that is not working
know
Competence to Perform
can
Capacity to Perform
do
Performance
target
gap_full
Gap between target and actual performance
gap_1
Gap between target and knowledge
gap_2
Gap between knowledge and capacity
gap_3
Gap between capacity and peformance
Total: 34
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.