The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / KEN_2018_ES_V01_M / variable [F1]
enterprise_surveys

Enterprise Survey 2018

Kenya, 2018 - 2019
Get Microdata
Reference ID
KEN_2018_ES_v01_M
DOI
https://doi.org/10.48529/475c-n477
Producer(s)
World Bank Group (WBG)
Collection(s)
Enterprise Surveys
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 28, 2020
Last modified
Jan 28, 2020
Page views
35301
Downloads
7115
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • kenya_2018_full_data

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: kenya_2018_full_data

Overview

Valid: 120
Invalid: 881
Type: Continuous
Decimal: 0
Start: 204
End: 206
Width: 3
Range: -9 - 730
Format: Numeric

Questions and instructions

Literal question
C.4 In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 6
28.6%
-7 Never registered (spontaneous) 0
0%
-6 Still in process 6
28.6%
-5 Application denied 1
4.8%
1 Less than one day 8
38.1%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.