The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / IMPACT_EVALUATION / RWA_2015-2018_LWHIE_V01_M / variable [F29]
impact_evaluation

Impact, Maintenance, and Sustainability of Irrigation Impact Evaluation Survey 2015-2018, Baseline, First, Second, Third Follow-up

Rwanda, 2015 - 2018
Get Microdata
Reference ID
RWA_2015-2018_LWHIE_v01_M
DOI
https://doi.org/10.48529/899t-y944
Producer(s)
Florence Kondylis, Maria Jones, John Loeser, Jeremy Magruder
Collection(s)
Impact Evaluation Surveys Development Impact Evaluation (DIME)
Metadata
Documentation in PDF DDI/XML JSON
Created on
Feb 27, 2020
Last modified
Mar 03, 2020
Page views
1599637
Downloads
3388
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • bl_hh_modules.dta
  • bl_hh_roster.dta
  • bl_parcel_plot_roster.dta
  • bl_rw_hh_modules.dta
  • bl_rw_hh_roster.dta
  • bl_rw_parcel_plot_roster.dta
  • bl_rw_season_17a.dta
  • bl_rw_season_17b.dta
  • bl_rw_season_17c.dta
  • bl_season_14c.dta
  • bl_season_15a.dta
  • bl_season_15b.dta
  • fup1_hh_modules.dta
  • fup1_hh_roster.dta
  • fup1_parcel_plot_roster.dta
  • fup1_rw_hh_modules.dta
  • fup1_rw_hh_roster.dta
  • fup1_rw_parcel_plot_roster.dta
  • fup1_rw_season_18a.dta
  • fup1_rw_season_18b.dta
  • fup1_rw_season_18c.dta
  • fup1_rw_season_19a.dta
  • fup1_season_16b.dta
  • fup1_season_16c.dta
  • fup1_season_17a.dta
  • fup2_hh_modules.dta
  • fup2_hh_roster.dta
  • fup2_parcel_plot_roster.dta
  • fup2_season_17b.dta
  • fup2_season_17c.dta
  • fup3_hh_modules.dta
  • fup3_hh_roster.dta
  • fup3_parcel_plot_roster.dta
  • fup3_season_18a.dta
  • fup3_season_18b.dta
  • fup3_season_18c.dta
  • fup3_season_19a.dta

[${plot_17b_d2}]: What were the reasons why you did not adequately irrigate your (pi1_11_7)

Data file: fup2_season_17b.dta

Overview

Valid: -
Invalid: 1635
Maximum: *
Type: Discrete
Decimal: 0
Start: 8517
End: 8519
Width: 3
Range: - *
Format: Numeric

Questions and instructions

Categories
Value Category
-77 Other (Specify)
1 The tertiary valve missed a scheduled watering
2 The tertiary valve faced inadequate water pressure
3 The tertiary valve received inadequate watering time
4 The tertiary valve used excessive water
5 Water blockage at the top of the Secondary pipe
6 Irrigation ditches were not clean
7 Tertiary valve broken
8 Broken hydraulic infrastructures
9 Conflicts among the WUG members
10 The flexible hose is very short
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.