The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / AZE_2002_ES_V01_M_WB / variable [F1]
enterprise_surveys

Enterprise Survey 2002

Azerbaijan, 2002
Get Microdata
Reference ID
AZE_2002_ES_v01_M_WB
DOI
https://doi.org/10.48529/6ryt-r626
Producer(s)
World Bank, European Bank for Reconstruction and Development
Collection(s)
Enterprise Surveys Fragility, Conflict and Violence
Metadata
DDI/XML JSON
Created on
Apr 01, 2011
Last modified
Sep 26, 2013
Page views
37458
Downloads
703
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Azerbaijan-2002--full
    data-5

Days it took to agree the loan with the bank (q65f)

Data file: Azerbaijan-2002--full data-5

Overview

Valid: 29
Invalid: 141
Minimum: 1
Maximum: 365
Mean: 21.655
Standard deviation: 67.366
Type: Discrete
Decimal: 0
Start: 412
End: 414
Width: 3
Range: 4 - 300
Format: Numeric

Questions and instructions

Literal question
How many days did it take to agree the loan with the bank from the date of application?
Categories
Value Category Cases
1 9
31%
2 4
13.8%
3 2
6.9%
6 1
3.4%
7 5
17.2%
14 1
3.4%
15 1
3.4%
20 1
3.4%
30 3
10.3%
60 1
3.4%
365 1
3.4%
Sysmiss 141
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.