The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • Collections
  • Terms of use
  • About
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / GEO_2002_ES_V01_M_WB / variable [F1]
enterprise_surveys

Enterprise Survey 2002

Georgia, 2002
Get Microdata
Reference ID
GEO_2002_ES_v01_M_WB
Producer(s)
World Bank, European Bank for Reconstruction and Development
Collection(s)
Enterprise Surveys
Metadata
DDI/XML JSON
Created on
Apr 01, 2011
Last modified
Sep 26, 2013
Page views
17669
Downloads
440
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Georgia-2002--full
    data-1,5

Longest number of days took goods to clear customs (q14b2)

Data file: Georgia-2002--full data-1,5

Overview

Valid: 20
Invalid: 154
Minimum: 1
Maximum: 23
Mean: 4.85
Standard deviation: 5.294
Type: Discrete
Decimal: 0
Width: 2
Range: 0 - 17
Format: Numeric

Questions and instructions

Literal question
What was the average and the longest number of days in 2001 that it took from the time your goods arrived in their point of exit (eg, port, airport) until the time they cleared customs?
Categories
Value Category Cases
1 3
1.7%
2 5
2.9%
3 5
2.9%
4 2
1.1%
7 1
0.6%
9 1
0.6%
10 1
0.6%
12 1
0.6%
23 1
0.6%
Sysmiss 154
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.