Value | Category | Cases | |
---|---|---|---|
Construction issues | 1 |
3.7%
|
|
Electricity power outages | 1 |
3.7%
|
|
Infrastructure Distractions due to Human beings themselves | 1 |
3.7%
|
|
Kuchakaa kwa Miundo mbinu ya maji kama mabomba yanayotumika kusambaza maji,kupasuka kwa mabomba ya maji | 1 |
3.7%
|
|
Kurekebisha miundo mbinu | 1 |
3.7%
|
|
Low supply of water | 2 |
7.4%
|
|
Maintainance | 2 |
7.4%
|
|
Maintanence | 1 |
3.7%
|
|
Maintanence and landslide | 1 |
3.7%
|
|
Maintenance | 6 |
22.2%
|
|
Miundombinu mibovu | 1 |
3.7%
|
|
Poor infrastructure | 1 |
3.7%
|
|
Poor system from the sources | 1 |
3.7%
|
|
Power outages | 1 |
3.7%
|
|
Problems on the supply pipes | 1 |
3.7%
|
|
Repairing of the pipes | 1 |
3.7%
|
|
Repairings of the pipes | 1 |
3.7%
|
|
Repairs of water infrastructure | 1 |
3.7%
|
|
Umeme ukikatika | 1 |
3.7%
|
|
Water Pumps Maintenance | 1 |
3.7%
|
This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.