Value | Category | Cases | |
---|---|---|---|
1 | flush/pour to piped sewage system | 209 |
53.6%
|
2 | flush/pour to septic tank | 53 |
13.6%
|
3 | flush/pour to pit latrine | 25 |
6.4%
|
4 | flush/pour to other location | 0 |
0%
|
5 | flush/pour to unknown | 0 |
0%
|
6 | ventilation improved pit latrine | 0 |
0%
|
7 | pit with slab | 0 |
0%
|
8 | pit witout slap/open | 0 |
0%
|
9 | composting toilet | 0 |
0%
|
10 | bucket | 1 |
0.3%
|
11 | hanging toilet/latrine | 0 |
0%
|
12 | no facilities (bush, field) | 101 |
25.9%
|
87 | other | 1 |
0.3%
|