The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / KEN_2003_ICS_V01_M_WB / variable [F1]
enterprise_surveys

Investment Climate Survey 2003

Kenya, 2002 - 2003
Get Microdata
Reference ID
KEN_2003_ICS_v01_M_WB
DOI
https://doi.org/10.48529/xp2t-zk14
Producer(s)
World Bank, Kenya Institute of Public Policy Research and Analysis
Collection(s)
Enterprise Surveys
Metadata
DDI/XML JSON
Created on
May 11, 2011
Last modified
Sep 26, 2013
Page views
62424
Downloads
2062
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Kenya-2003--full
    data-1

(s313cx)

Data file: Kenya-2003--full data-1

Overview

Valid: 167
Invalid: 0
Type: Discrete
Start: 2242
End: 2297
Width: 56
Range: -
Format: character

Questions and instructions

Categories
Value Category Cases
A LOT OF INEFFICIENCY 1
0.6%
A LOT OF UNNECESSARY VERIFICATION PROCEDURES 1
0.6%
A MATTER OF FOLLOWING PORT PROCEDURE 1
0.6%
ADMINISTRATION COST IS HIGH 1
0.6%
ADMINISTRATIVE BUREAUCRANCY 1
0.6%
ALOT OF BUREAUCRACY 1
0.6%
ALOT OF BUREAUCRACY & CORRUPTION 1
0.6%
ALOT OF INEFFICIENCY 1
0.6%
AS LONG AS YOU HAVE PAPERS RIGHT 1
0.6%
BREAKDOWN OF EQUIPMENTS 1
0.6%
BUREACRANCY 1
0.6%
BUREAUCRACY 4
2.4%
BUREAUCRACY AND DELAYS 1
0.6%
BUREAUCRATIC PROCEDURES 1
0.6%
BUREAUCRATIC PROCEDURES & ALOT OF CORRUPTION 1
0.6%
CHARGES ARE TOO HIGH 1
0.6%
COMPETITAVE 1
0.6%
CONGESTION 1
0.6%
CONGESTION/INNEFFICIENCY/CORRUPTION 1
0.6%
CORRUPTION 1
0.6%
CORRUPTION & DELAYS IN PROCEDURES 1
0.6%
CORRUPTION NAD DELAYS IN OPERATIONS 1
0.6%
CORRUPTION/BRIBERY LEADING TO IMPORT DELAYS 1
0.6%
COULD NOT COMMENT 1
0.6%
CURRUPTION AND BUREAUCRATIC PROCEDURES 1
0.6%
CURRUPTION BUT IS MANAGEABLE - IT HAS REDUCED 1
0.6%
DAMAGE TO CONSIGNMENT 1
0.6%
DELAY 1
0.6%
DELAY AND UNNECESSARY INSPECTION 1
0.6%
DELAY IN PROCEDURES AT THE PORT 1
0.6%
DELAYING TACTICS 1
0.6%
DELAYS DUE TO BUREAUCRACY 1
0.6%
DELAYS IN CLEARANCE 1
0.6%
DELAYS IN OPERATION 1
0.6%
DELAYS IN PORT OPERATIONS 1
0.6%
DELAYS/ NON WORKING EQUIPMENTS 1
0.6%
DELAYS/BUREAUCRACY 1
0.6%
DO NOT EXPORT 1
0.6%
DO NOT HAVE STANDARD PROCEDURES 1
0.6%
DO NOT USE IT FOR BUSSINESS. 1
0.6%
DO NOT USE THE PORT 1
0.6%
DOCUMENTATION AND CLEARANCE 1
0.6%
DOES NOT ENGAGE IN DIRECT EXPORT & IMPORT OF GOODS 1
0.6%
DON'T USE IT 1
0.6%
DONE BY KTDA BUT IF THERE IS A COST KTDA CHARGES FACTORY 1
0.6%
DONT USE 1
0.6%
DONT USE THE FACILITY MUCH 1
0.6%
EFFICIENT 1
0.6%
EQUIPMENT ARE POOR 1
0.6%
EQUIPMENT BREAKDOWN SUCH AS CRANES IS A BIG PROBLEM 1
0.6%
EQUIPMENT NOT ALWAYS WORKING 1
0.6%
EQUIPMENTS ARE NOT VERY EFFICIENT 1
0.6%
FEW WORKING HOURS 1
0.6%
FIRM ALWAYS PAY STORAGE CHARGES BECAUSE OF THE DELAY 1
0.6%
FREQUENT FAILURE OF MACHINES EG, CRANES 1
0.6%
GOODS TAKE MANY DAYS FROM NAIROBI TO MOMBASA 1
0.6%
GOVERNMENT NOT ENCOURAGING PEOPLE 1
0.6%
HAS HAD NO PROBLEM 1
0.6%
HAS IMPROVED 1
0.6%
HIGH TARIFFS TO BE PAID AND PROCESS STREAMLINED 1
0.6%
IF DOCUMENTATION IS OK, NO PROBLEM 1
0.6%
IMMIGRATION RELATED COMPLAINS 1
0.6%
IMPROVING 1
0.6%
INCOMPEENT WORKERS AT PORT 1
0.6%
INEFFECIENT/EXPENSIVE. 1
0.6%
INEFFICIENCES 1
0.6%
INEFFICIENCIES 1
0.6%
INEFFICIENCY IN OPERATIONS 1
0.6%
INEFFICIENCY IN THE PROCESSES 1
0.6%
INEFFICIENT & SLOW 1
0.6%
INEFFICIENT PROCEDURES 1
0.6%
INSPECTION STAGES ARE TOO MANY HENCE COMPLICATION 1
0.6%
IT HAS CLEARING AGENT 1
0.6%
IT IS WELL UNDERSTOOD 1
0.6%
IT NEEDS MAJOR OVERHAUL 1
0.6%
ITEM COSTING $50 1
0.6%
LACK OF EFFICIENCY 1
0.6%
LACK OF EQUIPMENT & ADMINISTRATIVE PROBLEM 1
0.6%
LEVY CHARGES ARE HIGH 1
0.6%
LOND PERIOD TAKEN TO OFFLOAD 1
0.6%
MOST WORK DONE BY AGENTS. 1
0.6%
NO COMMENT 10
6%
NO COMMENT WERE GIVEN 1
0.6%
NO EXPERIENCE WITH PORTS 1
0.6%
NO OPINION 1
0.6%
NO PROBLEM/STREAMLINED PROCEDURES. 1
0.6%
NOT AFFECTED BY ANY WAY 1
0.6%
NOT FRIENDLY AND ARE CORRUPT 1
0.6%
OCCASIONALLY SOME EQUIPMENTS SUCH AS CRANES NOT WORKING 1
0.6%
OKEY 2
1.2%
OLD EQUIPMENT HAMPERS EFFICIENCY AT THE PORT 1
0.6%
OPERATIONS ARE OKEY 1
0.6%
OPERATIONS ARE OKEY. 1
0.6%
OPERATIONS CHANGED 1
0.6%
OVERCHARGING 1
0.6%
POOR EMPLOYEES ATTITUDE 1
0.6%
PORT INNEFFICIENCY 1
0.6%
PORT VERY INNEFFICIENT 1
0.6%
PROCEDURE NOT STREAMLINED 1
0.6%
PROCESS ARE STRAIGHT FOWARD 1
0.6%
PROCESS IS LONG & CUMBERSOME BEFORE GOODS GET RELEASED 1
0.6%
PROCESS TOO SLOW 1
0.6%
PROVIDED THERE IS NO DOCUMENTATION 1
0.6%
PUBLIC HEALTH INSPECTORS CHARGE KSH 6000 INSPECTION FEE 1
0.6%
QUITE GOOD 1
0.6%
REFERS TO NAIROBI INLAND PORT 1
0.6%
RELIES ON CLEARING AGENTS 1
0.6%
RIGIDITY BY PERSONNELON PAPER ISSUES 1
0.6%
SERVICES ARE EFFICIENT 1
0.6%
SERVICES ARE GOOD 3
1.8%
SERVICES ARE GOOD BUT A LOT OF RED TAPE 1
0.6%
SERVICES ARE OKEY BUT TOO EXPENSIVE 1
0.6%
SERVICES ARE WITHIN THE ACCEPTED STANDARD 1
0.6%
SERVICES HAVE IMPROVED 1
0.6%
SEVERAL STEPS INVOLVES . 1
0.6%
SHIPPING DELAYS AND ERRORS IN DOCUMENTATION 1
0.6%
SHIPPING OVER THE WEEKWED 1
0.6%
SLOW & EXPENSIVE 1
0.6%
SO BEREAUCRATIC 1
0.6%
SOME EQUIPMENTS SUCH AS CRANES ARE NOT WORKING-WORN OUT 1
0.6%
SOMETIMES THEY SAY THEY DONT HAVE UNLOADING SERVICES 1
0.6%
SYSTEM DO NOT WORK ON THEIR OWN 1
0.6%
THE FIRM DOES NOT IMPORT OR EXPORT DIRECTLY 1
0.6%
THE PORT OPERATIONS SHOULD BE PROVITISED TO MAKE IT EFFI 1
0.6%
THE SERVICES ARE EFFICIENT & FAST 1
0.6%
THEFT 1
0.6%
THEIR OPERATIONS ARE OKEY. 1
0.6%
THER IS ALOT OF DALAY 1
0.6%
THERE ARE MANY BROKERS UNIDENTIFIED 1
0.6%
THERE IS ALOT OF CONGESTION CAUSING DELAY 1
0.6%
THERE IS ELEMENT OF CORRUPTION 1
0.6%
THEY ARE IMPROVING 1
0.6%
THEY SOMTIMES INSIST ON LOCAL INSPECTION AND PRICING 1
0.6%
TOO MANY PROCEDURES TO BE FOLLOWED 1
0.6%
TOO MUCH DELAY 1
0.6%
TOO MUCH PAPER WORK 1
0.6%
TOO MUCH RED TAPE, DELAY & BUREAUCRACY 1
0.6%
TOO SLOW 2
1.2%
TOO SLOW BUT DEMAND HIGH PRICES FOR SERVICES 1
0.6%
TOO SLOW IN SERVICE PROVISION 1
0.6%
TOO SLOW TO PROCESS 1
0.6%
UN FRIENDLY OFFICIALS WHO ARE VERY FRUSTRATING 1
0.6%
UNNECESSARY BARRIES 1
0.6%
UNNECESSARY DELAY & PROCEDURAL ABSTACLES 1
0.6%
UNNECESSARY DELAYS CAUSED 1
0.6%
UNNECESSARY DELAYS DUE TO LIMITED KNOWLEDGE BY OFFICIALS 1
0.6%
USE CLEARING AGENT 1
0.6%
USES CLEARING AGENT 1
0.6%
VAT PAYMENT & CORRUPT PRACTICES WHILE OTHERS DON'T PAY 1
0.6%
VERY SLOW 1
0.6%
VERY SLOW IN THEIR OPERATIONS 1
0.6%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.