The World Bank Working for a World Free of Poverty Microdata Library
  • Data Catalog
  • About
  • Collections
  • Citations
  • Terms of use
  • Login
    Login
    Home / Central Data Catalog / ENTERPRISE_SURVEYS / RUS_2012_ES_V01_M_WB / variable [F2]
enterprise_surveys

Enterprise Survey 2012

Russian Federation, 2011 - 2012
Get Microdata
Reference ID
RUS_2012_ES_v01_M_WB
DOI
https://doi.org/10.48529/qctz-wj62
Producer(s)
World Bank, European Bank for Reconstruction and Development
Collection(s)
Enterprise Surveys
Metadata
DDI/XML JSON
Created on
Dec 05, 2012
Last modified
Sep 26, 2013
Page views
59261
Downloads
13994
  • Study Description
  • Data Description
  • Documentation
  • Get Microdata
  • Data files
  • Russia-2012-full
    data

Number of days it took to obtain electrical connection (c4)

Data file: Russia-2012-full data

Overview

Valid: 439
Invalid: 3781
Type: Discrete
Decimal: 0
Start: 872
End: 889
Width: 18
Range: -9 - 730
Format: Numeric

Questions and instructions

Literal question
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know 59
13.4%
-6 Still in process 48
10.9%
-5 Application denied 24
5.5%
1 <1 31
7.1%
2 9
2.1%
3 11
2.5%
5 9
2.1%
6 2
0.5%
7 9
2.1%
9 2
0.5%
10 17
3.9%
12 1
0.2%
14 8
1.8%
15 6
1.4%
20 10
2.3%
21 1
0.2%
25 1
0.2%
28 1
0.2%
30 56
12.8%
31 1
0.2%
35 1
0.2%
40 3
0.7%
45 7
1.6%
50 1
0.2%
55 1
0.2%
60 20
4.6%
70 1
0.2%
75 1
0.2%
80 1
0.2%
90 16
3.6%
100 2
0.5%
110 1
0.2%
120 7
1.6%
130 1
0.2%
150 4
0.9%
160 1
0.2%
165 1
0.2%
180 22
5%
183 1
0.2%
200 1
0.2%
240 4
0.9%
270 1
0.2%
300 2
0.5%
360 5
1.1%
365 10
2.3%
366 1
0.2%
400 3
0.7%
420 1
0.2%
500 2
0.5%
547 1
0.2%
550 1
0.2%
593 1
0.2%
730 8
1.8%
Sysmiss 3781
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for electrical connection. Self-explanatory
Back to Catalog
The World Bank Working for a World Free of Poverty
  • IBRD IDA IFC MIGA ICSID

© The World Bank Group, All Rights Reserved.

This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser. To learn more about cookies, click here.